May 2020 - Public Involvement Meeting (PIM) #2Ĭascade Mountain Road, Cascade Mountain Road bridge over I-39, and the four interchange ramps will be detoured for construction.May 2020 - Public Involvement Meeting (PIM) #1.Installation of barrier wall at the I-39/WIS 33 interchange NorthWest off Ramp.Repairs to median barrier wall on I-39 southbound between Cascade Mountain Road and I-90/94/78 interchange.The study will assess how best to address existing and future traffic demands, safety issues and the aging and outdated infrastructure along this portion of I-39/90/94. Repairs to Bridge on Cascade Mountain Road over I-39 With mobility, convenience, and safety in mind, IDOT makes it a priority to consistently update our motorists on planned lane changes or closures due to road. The study will also evaluate I-39 from the I-39 and I-90/94 split near Portage (locally known as the Petro Interchange) to Levee Road. Alternatively, use our mobile apps (iOS or Android) for free trip calculations for all the vehicles including trucks. For trucks, buses and RV with or without trailers, subscribe to Web Calculator.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |